Wednesday, June 20, 2012

After the structure fell to the ground, we took it apart and organized all the pieces in the yard. We then spent a couple of months completing the duplex on Queen. The house has been rebuilt from those pieces. A lot of new materials were required. The framing, for example, had to be all-new due to extensive damage. Siding and a number of architectural elements were used again. The experience has been most humbling for me. I have learned valuable lessons that I may not have learned any other way.  
On January 19, we were deeps in the throws of working on the structure. At approximately 12:30 in the afternoon, the entire house suddenly started to shift in a rather unplanned way. I was the only person inside the home and was able to escape with no injuries. The home stood in varying states of leaning until she finally fell to the ground about a week later. See photos.



Friday, January 13, 2012

Roxy shown standing on new partially constructed sub-floor and support system.

Wednesday, January 4, 2012

New band joist in place along front of house.
Showing interior view of northeast corner of original structure. Wall is supported. Floor system removed. Rotted band joist has been removed. Old band was full 8x6 timber. Will be replaced with 4-ply 2x12. Floor joists to be 2x12 @ 16" O.C.

Monday, December 19, 2011

Earl (shown waving from upstairs window) and his son, Anthony, pulled the siding down today. One can more easily picture what the completed home will look like now that a difference can be seen between the gambrel and the lower wall. The green asphalt shingles on the gambrel front will be replaced with cedar shake. The German siding below that will be restored.

Friday, December 16, 2011

Eastern most chimney collapsed and will have to be rebuilt. Clay bricks were soft due to exposure to constant moisture.