A blog about the restoration of a wonderfully unusual house in Durham's Cleveland+Holloway neighborhood.
Thursday, August 28, 2014
After numerous attempts to dry out footing for inspection, we finally had to resort to an engineered footing. Footing widened, lined with #57 gravel and poured.